Viganò International cut-to-length line shows its performances at Daming opening ceremony in JingJiang

 

On november 28, 2015, Daming celebrated the opening ceremony of the new advanced factory in JingJiang – Jiangsu.
Over 1000 people attended to the spectacular cerminony, including Daming’s clients and suppliers from all over the world gathered in JingJiang to share happiness and congratulations together with Daming’s personnel.

 

Mr Zhou speaking at Daming opening ceremony in JingJiang.

Mr Zhou speaking at Daming opening ceremony in JingJiang.

 

Daming JingJiang new factory is going to be among the biggest and most advanced factory in China, and featuring the highest level metal processing equipment able to produce steel sheets and heavy duty high complexity mechanical components.

Vigano International proudly contributed to the development of the newly established JingJiang factory as equipment supplier, with a heavy duty cut to length line to process carbon steel and stainless steel from 2 to 20 mm thickness and from 600 to 2.200 mm width

 

Viganò International cut-to-length line 2200x20mm at Daming's factory in JingJiang

Viganò International cut-to-length line 2200x20mm at Daming’s factory in JingJiang

 

After the cerimony all the guests have been guided throughout a factory tour, to have a comprehensive view of all top-notch advanced equipment newly installed. Among the equipment, Vigano International cut to length 20×2200 mm line dragged the attention of many guests, who stand by the cut to lenght line to assist to cutting operations of a heavy duty high strenght coil. Vigano’s cut to length line raised highly appreciation from all the guests for the high quality of Vigano’s equipment and related processed metal sheets.

 

Deming's guests attending  cutting operations performed by Viganò International ctl line 2200x20mm

Daming’s guests attending cutting operations performed by Viganò International ctl line 2200x20mm

 

All the team of Vigano International participated to the cerimony, including Mr. Silvano Viganò, Mr. Pietro Galbiati from Italy, and the Vigano International China sales and installation team, Mr. Giuseppe Auguadro, Mr. Fabio Sironi and Mr. Tony Fei.

 

Daming & Viganò International Teams (from left to right:. Mr. Tang, Mr. Galbiati, Miss Jiang Yang, Mr. Zhou, Mr. Viganò, Mr. Auguadro and Mr. Fei, and Mr. Sironi)

Daming & Viganò International Teams
(from left to right:. Mr. Tang, Mr. Galbiati, Miss Jiang Yang, Mr. Zhou, Mr. Viganò, Mr. Auguadro and Mr. Fei, and Mr. Sironi)

 

The whole Vigano International team expressed great congratulations to Daming’s achievement.

 

Viganò international equipment introduction in Daming factory - JingJiang

Viganò international equipment introduction in Daming factory – JingJiang